Cedar Pond Spillway

Project Name: Cedar pond spillway

Construction: 2019

Design Engineer: GZA Environmental

Contractor: Ron John Construction

Location: Cedar Pond- Watershed

Project Summary: Due to dam safety requirements, the spillway at Cedar pond was lowered and reconstructed. Water from Cedar pond goes to Clinton Reservoir. This is a small Hazard spillway. The pond was lowered during construction.

Previous
Previous

Hanks Pond Spillway

Next
Next

Valley Road Corrosion Control Phase 1 Improvements