Chemical Line Replacement
Project Name: Chemical Line Replacement PWTP - Pretreat
Construction: 2019-2020
Design Engineer: Mott Macdonald
Contractor: Underground Utilities
Location: Pequannock Water Treatment Plant- Pre Treatment
Cost: $750,000.00
Project Summary: The city has installed a new chlorine generation system at Pretreatment facility. The pipes were installed to transfer chlorine from Pretreatment to the treatment plant. Four 6” pipe lines were installed to the system during this project.