Hanks Pond Spillway

Project Name: Hanks Pond Spillway

Construction: 2019

Design Engineer: GZA Environmental

Contractor: Ron John Construction

Location: Hanks Pond Watershed

Project Summary: Due to dam safety requirements, the spillway at Hanks pond was lowered and reconstructed. Water from Cedar Pond goes to Clinton Reservoir. This is a small hazard spillway. The pond was lowered for construction.