Hanks Pond Spillway
Project Name: Hanks Pond Spillway
Construction: 2019
Design Engineer: GZA Environmental
Contractor: Ron John Construction
Location: Hanks Pond Watershed
Project Summary: Due to dam safety requirements, the spillway at Hanks pond was lowered and reconstructed. Water from Cedar Pond goes to Clinton Reservoir. This is a small hazard spillway. The pond was lowered for construction.