Project Name: Cedar Pond Spillway

Construction: 2019

Design Engineer: GZA Environmental

Contractor: Ron John Construction

Location: Cedar Pond Watershed

Project Summary: Due to dam safety requirements, the spillway at Cedar Pond was lowered and reconstructed. Water from Cedar Pond goes to Clinton Reservoir. This is a small hazard spillway. The pond was lowered during construction.