Cedar Pond Spillway
Project Name: Cedar Pond Spillway
Construction: 2019
Design Engineer: GZA Environmental
Contractor: Ron John Construction
Location: Cedar Pond Watershed
Project Summary: Due to dam safety requirements, the spillway at Cedar Pond was lowered and reconstructed. Water from Cedar Pond goes to Clinton Reservoir. This is a small hazard spillway. The pond was lowered during construction.