Pequannock Plant Roof Replacement
Project Name: Pequannock Water Treatment Plant Roof Replacement
Construction: 2020-2021
Design Engineer: PCI Engineers
Contractor: Mak Group
Location: Pequannock Water Treatment Plant
Cost: $1,500,000.00
Project Summary: Due to roof leakage at the Pequannock Water Treatment Plant, the City replaced the gravel filled roof with a TPO roof. This improves weather protection for the building and prevents leaks in the future. This project protects both the integrity of the building and the equipment in the plant.